2/25/24

Area 5- The Roof

This video details the sefarity of the failing roof. This issue is currently being addressed by the BOE with a temporary coating that will be applied hopefully this year. This will not be a permeant fix but a temporary one until the school arrives at a permeant solution.

Previous

Area 4- Water Issues and Failing Infrastructure Due to Hard Water